| What exactly is the supplier doing, and what stays with your team? # |
Separate collection or production from coordination, consent and privacy handling, quality review, and final acceptance. Write down any assumption that still needs agreement. |
Whether both sides are scoping the same job, or one side has silently included work the other expects to own. |
| What counts as one deliverable unit? # |
What belongs in the unit, what must travel with it, and what is excluded. |
Whether volume can be counted consistently and whether hidden work sits outside the stated unit. |
| What is the full recording or production period? # |
The number of working days or the date window, plus the expected work pattern within it. Hours per day without the number of days is incomplete. |
Whether the schedule and staffing request are measurable rather than implied. |
| What files, samples or recording conditions will the supplier actually receive? # |
The input condition, the relevant contributor or speaker profile, and the conditions that would make the source unusable. |
Whether the scope is based on the material that will arrive, rather than an ideal example. |
| What must the finished delivery contain? # |
File type, technical settings, metadata, naming rules, packaging, and anything that must accompany each unit. |
Whether the supplier is building the output you can actually ingest and review. |
| What equipment is required, and who is responsible for it? # |
The device and specification, who buys or supplies it, who configures it, who handles shipping, and what happens to it afterwards. |
Whether a major operational responsibility is included, excluded, or still sitting between the two sides. |
| Where will the work happen, and how will material move? # |
Who owns the workspace, how access is granted, how uploads are batched, and who receives each hand-off. |
Whether the delivery route works in practice and where material could stall. |
| Who handles privacy, consent and quality review? # |
One named side for each activity, including final acceptance. Do not leave an assumption doing the work of an agreement. |
Whether sensitive or quality-critical tasks have a real owner. |
| What will count as accepted, and who can approve a change? # |
The acceptance rule, reviewer, correction route, exclusions, and who can approve a scope change. |
Whether everyone shares the same definition of done and whether later changes will be visible. |